The Alucobond decision reinforces that building defect claims are rarely about a single product or party. Owners corporations should investigate early to understand how design, installation, certification and construction decisions may have contributed to the defect.

The Federal Court’s decision in Owners – Strata Plan No 87231 v 3A Composites GmbH (No 10) [2026] FCA 351 is one of the most significant cladding decisions delivered in Australia in recent years.

At first glance, the case appears to be about combustible cladding. More specifically, it concerned claims brought against the manufacturers and distributors of Alucobond PE and Alucobond Plus, products used on buildings throughout Australia.

However, the most important lesson from the judgment may have very little to do with cladding itself.

Instead, the decision raises a broader question for owners corporations, strata managers and building owners: When defects emerge in a building, where should responsibility actually sit?

The Case

The proceeding was brought as a class action on behalf of owners of buildings that incorporated Alucobond PE or Alucobond Plus cladding.

The applicants alleged that the products were unsafe, non-compliant and not of acceptable quality. They also alleged that representations made about the products were misleading.

Following an extensive trial involving fire engineers, chemists and building experts, the Federal Court rejected the claims.

The Court ultimately concluded that the products themselves could not be characterised as inherently defective in the manner alleged by the applicants.

Why the Decision Matters

What makes the judgment particularly interesting is the Court’s reasoning.

Rather than treating the issue as a simple product liability dispute, the Court focused on the reality that building safety cannot be assessed by looking at a construction product in isolation.

Whether a building presents an unacceptable fire risk depends on numerous factors, including:

  • the design of the building;
  • the fire engineering strategy;
  • the manner in which the product was specified;
  • how it was installed;
  • the certification pathway adopted; and
  • the regulatory framework that applied at the time of construction.

In effect, the Court recognised that the same product may produce very different outcomes depending on how and where it is used.

This distinction is significant because it shifts attention away from the product itself and towards the decisions made throughout the design and construction process.

What This Means for Owners Corporations

For many owners corporations, combustible cladding has historically been viewed as a product problem.

This judgment suggests that approach may be too simplistic.

If liability depends on building-specific circumstances, recovery efforts may require a much deeper investigation into the conduct of those involved in the development process. Builders, architects, fire engineers, building surveyors, certifiers and consultants may all become relevant depending on the circumstances of the project.

While this does not necessarily make recovery impossible, it does make it more complex.

Unlike a claim focused on a single product manufacturer, building defect claims often require detailed evidence regarding who made particular decisions, what standards applied at the time and whether those decisions contributed to the loss ultimately suffered by the owners corporation.

A Broader Lesson Beyond Cladding

Although the case concerned combustible cladding, its implications extend well beyond cladding disputes.

Many building defect claims involve similar questions.

Waterproofing failures, façade defects, structural movement, fire safety issues and building services defects often arise from a combination of design decisions, product selection, workmanship and certification processes.

The Alucobond decision serves as a reminder that building defects rarely have a single cause.

The temptation is often to search for one responsible party. In reality, responsibility is frequently shared among multiple participants who each played a role in creating the risk.

The Importance of Early Investigation

Perhaps the most important takeaway for Victorian owners corporations is the importance of acting early.

Where recovery options depend on project-specific evidence, delays can significantly impact a claim. Documents become harder to locate, participants move on, memories fade and limitation periods continue to run.

Owners corporations should not wait until defects become critical before investigating their position.

Understanding who was involved in the design and construction of a building, and preserving the evidence needed to assess potential claims, is often just as important as identifying the defect itself.

Final Thought

The Federal Court’s decision may be remembered as the cladding class action that failed. However, its longer-term significance may be something quite different.

The judgment challenges the idea that combustible cladding is simply a product liability issue. Instead, it reinforces a principle that many defect practitioners encounter every day: building failures are often the product of decisions, not just products.

For owners corporations, that distinction may prove critical when considering how, and against whom, recovery action should be pursued.

This article was first published on June 23, 2026 and was written by Julia Moroz, Partner in our Melbourne office.

© Bugden Allen Group Legal Pty Ltd. This is general information only and not legal advice. You should not rely on this information without seeking legal advice tailored to your specific circumstances.

Julia Moroz

Partner

Julia Moroz is a Partner at Bugden Allen who advises owners corporations, strata communities, insurers and property stakeholders on building defects, defect recovery and complex property disputes.

Julia has developed a particular focus on helping owners corporations navigate major building defect issues, from initial investigations and expert reports through to dispute resolution, litigation, and recovery of rectification costs. She is regularly engaged to advise on technically complex and high-value matters involving developers, builders, consultants, certifiers, engineers, and insurers.

Her practice combines deep expertise in property litigation, strata law and insurance-related disputes, enabling her to deliver practical, strategic, and commercially focused advice to clients facing significant building and infrastructure issues. She is particularly experienced in advising on waterproofing failures, façade and cladding issues, fire safety defects, structural defects, professional negligence claims, and multi-party recovery actions.

Julia understands the significant financial, operational and governance challenges that building defects can create for owners corporations and property stakeholders. She works closely with committees, strata managers, experts and insurers to develop effective recovery strategies, manage risk and achieve efficient resolution of disputes. Her focus is on delivering practical outcomes that protect her clients’ interests, whether through negotiation, alternative dispute resolution, or litigation.

Working across Australia, Julia is recognised for her ability to manage complex disputes involving multiple parties and competing interests while maintaining a clear focus on commercial outcomes and successful building rectification projects.

Julia’s experience includes advising on:

  • building defects affecting residential, mixed-use, and commercial developments
  • waterproofing, façade, structural and fire safety defects
  • recovery claims against builders, developers, certifiers, architects, and engineers
  • professional negligence claims involving construction professionals
  • insurance disputes arising from defective building work
  • owners corporation litigation and dispute resolution
  • recovery of rectification costs arising from defective design and construction
  • multi-party recovery and contribution proceedings
  • common property defect claims and building rectification projects
  • alternative dispute resolution, litigation and negotiated settlements of defect-related disputes
Julia Moroz

Julia Moroz

Partner

Julia Moroz is a Partner at Bugden Allen who advises owners corporations, strata communities, insurers and property stakeholders on building defects, defect recovery and complex property disputes.Julia has developed a particular focus on helping owners corporations navigate major building defect issues, from initial investigations and expert reports through to dispute...

View profile of Julia Moroz
Written by Julia Moroz
Partner

Julia Moroz is a Partner at Bugden Allen who advises owners corporations, strata communities, insurers and property stakeholders on building defects, defect recovery and complex property disputes.

Julia has developed a particular focus on helping owners corporations navigate major building defect issues, from initial investigations and expert reports through to dispute resolution, litigation, and recovery of rectification costs. She is regularly engaged to advise on technically complex and high-value matters involving developers, builders, consultants, certifiers, engineers, and insurers.

Her practice combines deep expertise in property litigation, strata law and insurance-related disputes, enabling her to deliver practical, strategic, and commercially focused advice to clients facing significant building and infrastructure issues. She is particularly experienced in advising on waterproofing failures, façade and cladding issues, fire safety defects, structural defects, professional negligence claims, and multi-party recovery actions.

Julia understands the significant financial, operational and governance challenges that building defects can create for owners corporations and property stakeholders. She works closely with committees, strata managers, experts and insurers to develop effective recovery strategies, manage risk and achieve efficient resolution of disputes. Her focus is on delivering practical outcomes that protect her clients’ interests, whether through negotiation, alternative dispute resolution, or litigation.

Working across Australia, Julia is recognised for her ability to manage complex disputes involving multiple parties and competing interests while maintaining a clear focus on commercial outcomes and successful building rectification projects.

Julia’s experience includes advising on:

  • building defects affecting residential, mixed-use, and commercial developments
  • waterproofing, façade, structural and fire safety defects
  • recovery claims against builders, developers, certifiers, architects, and engineers
  • professional negligence claims involving construction professionals
  • insurance disputes arising from defective building work
  • owners corporation litigation and dispute resolution
  • recovery of rectification costs arising from defective design and construction
  • multi-party recovery and contribution proceedings
  • common property defect claims and building rectification projects
  • alternative dispute resolution, litigation and negotiated settlements of defect-related disputes
Julia Moroz
Written by Julia Moroz Partner

Julia Moroz is a Partner at Bugden Allen who advises owners corporations, strata communities, insurers and property stakeholders on building defects, defect recovery and complex property...

ONLINE ENQUIRY

Contact us to arrange a consult with one of our team members.

Related Articles

Legislative Reform

01/07/2026

New AML Laws Are Here: What Our Clients Need to Know

Queensland

07/08/2026

Overdrawn Accounts and Inter Fund Transfers: What Every Queensland Body Corporate Manager Needs to Know post Artique

Case Law, Western Australia

22/07/2026

Shutting down discussions between lot owners at general meetings – a breach of the Strata Titles Act 1985 (WA)?

Locations

Our Locations Across Australia